NORTHEAST PENNSYLVANIA REGIONAL BRIDGE BUILDING COMPETITION
  • Home
  • Forms
  • Sponsorship
  • FAQ
    • Coverage Area
    • Construction & Design Suggestions
    • Running Your Own School Bridge Competition
    • Terms of Service and Privacy Policy
  • 2025 Competition
  • About
  • Prior Year Events
    • Past Winners
    • 2024 Competition
    • 2023 Competition
    • 2022 International >
      • 2022 Results - International
      • 2022 Photos - International
    • 2022 Competition >
      • 2022 Results
      • 2022 Competition Criteria
      • 2022 Photos
    • 2021 Competition >
      • 2021 Competition Criteria
    • 2020 Competition >
      • 2020 Results
      • 2020 Photos
    • 2019 Competition >
      • 2019 Results
    • 2018 Competition >
      • 2018 Results
      • 2018 Photos
    • 2017 Competition >
      • 2017 Results
    • 2016 Competition >
      • 2016 NEPA Reg. Bridge Building Results
      • 2016 NEPA Reg. Bridge Building Criteria
    • 2015 Competition >
      • 2015 Northeast Pennsylvania Regional Bridge Building Results
      • 2015 Competition Photos
      • 2015 Northeast Pennsylvania Regional Bridge Building Sponsors
    • 2014 Competition >
      • 2014 Northeast Pennsylvania Regional Bridge Building Competition
      • 2014 Sponsors of the Northeast Pennsylvania Regional Bridge Building Competition
      • 2014 Criteria
    • 2013 Competition >
      • 2013 Scranton Times Newspaper Article
      • 2013 NEPA Competition Photos
    • 2012 Competition >
      • 2012 Competition Results
      • 2012 Photos
      • 2012 Sponsors
    • 2011 Competition >
      • 2011 International Competition Results
      • 2011 NEPA Regional Results
      • 2011 Photos
      • 2011 Sponsors
    • 2010 Competition >
      • 2010 Competition Results
      • 2010 Photos
      • 2010 Sponsors
    • 2009 Competition >
      • 2009 Competition Results
      • 2009 Photos
      • 2009 Sponsors
    • 2008 Competition >
      • 2008 Competition Results
      • 2008 Photos
      • 2008 Sponsors
    • 2007 Competition >
      • 2007 Competition Results
      • 2007 Photos
      • 2007 Sponsors
    • 2006 Competition >
      • 2006 Competition Results
      • 2006 Photos
      • 2006 Sponsors
    • 2005 Competition >
      • 2005 Competition Results
      • 2005 Photos
      • 2005 Sponsors
    • 2004 Competition >
      • 2004 Competition Results
      • 2004 Photos
      • 2004 Sponsors
    • 2003 Competition >
      • 2003 Competition Results
      • 2003 Photos
      • 2003 Sponsors
    • 1998 - 2002 Competitions >
      • 2002 Sponsors
      • 2001 Sponsors
      • 1998 through 2002 Competition Results
      • 1998 - 2000 Sponsors

2021 Competition Criteria

Picture

2021 NEPA Regional Bridge Building Competition Criteria


These rules have been developed independent of the International Bridge Building Committee specifically for the Northeast Pennsylvania Regional Bridge Building Competition to be held on Saturday Aril 10, 2021 virtually.

A virtual competition will be held at a date to be determined. Materials WILL NOT BE PROVIDED by the committee. Participants are to use 3/32” x 3/32 Basswood provided on their own or by their schools. (Example: Midwest Products SKU 4033) Schools are permitted to register an unlimited number of entries but all bridges MUST be designed and fabricated by each participant. (NO TEAMS ARE PERMITTED). All students will participate by mail-in entry, or direct delivery. We intend to setup at least one 2-4 hour period in a relatively centralized location where students can drop off their entry and receive immediate feedback on their bridge. Social distancing will be REQUIRED. NO modifications will be permitted after entry. The competition will be either live-streamed and/or recorded and posted. YouTube is expected to be the streaming platform. We will attempt to secure a venue where students may attend the competition depending on the COVID situation and state/local guidelines at the time of the event. The allowance to attend is not guaranteed. Details to follow. ​

Please visit our website www.neparbdgblg.com for specific suggestions and information relative to our competition. If you have any questions, please feel free to contact: Paul Schneider at [email protected].

The object of this contest is to see who can design, construct and test the most efficient bridge within the criteria established below. Model bridges are intended to be simplified versions of real-world bridges, which are designed to permit a load to travel across the entire bridge. In order to simplify the model bridge design process, the number of loading positions is reduced, and to allow the contest to proceed in a reasonable amount of time, only one loading position is actually tested. These simplifications do not negate the requirement that the bridge must be designed to accept a load at any of the positions. Bridges determined by the judges to not meet this requirement will be disqualified and tested as unofficial bridges. 
Competition Criteria
2021_criteria.pdf
File Size: 272 kb
File Type: pdf
Download File


1. Materials
  1. The bridge must be constructed only from suitable 3/32 inch square cross-section basswood and any commonly available adhesive.
  2. The basswood may be notched, cut, sanded or laminated in any manner but must still be identifiable as 3/32 x 3/32 in2 basswood.
  3. No other materials may be used. The bridge may not be stained, painted or coated in any fashion with any foreign substance.
​
Picture
2. Construction
  1. The bridge mass shall be no greater than 25.00 grams.
  2. The bridge (see Figure 1) must span a gap (S) of 300. mm, be no longer (L) than 400. mm, be no taller (H) than 100. mm above the upper support surface, and no wider (W) than 80. mm at the loading surface. 
  3. ​The bridge must be constructed to provide a horizontal support for the load (see 3.4) at each of the three possible loading locations. Any portion of the structure above the loading plane must provide clearance for the plate and the loading rod above as well as for the rod projecting below the loading plate (see Figure 2).
  4. The bridge must be constructed to allow a 48. mm diameter, 300. mm long pipe (1.5 inch schedule 40 PVC pipe) to be passed horizontally across the bridge with the pipe's lower surface on the loading plane (P) between 20. and 40. mm above the support surface. This pipe must touch all three loading locations simultaneously (see 3.4).
  5. The bridge structure may project a maximum of (B) of 30. mm below the support surfaces (see Figure 1) at any location
    except for a distance (T) 20. mm TOTAL, A minimum of 10. mm to the left and 10. mm to the right of Loading Point (Y).​
​
​3. Loading
  1. On the day of the competition, the judges will decide which one of the three loading locations will be used; it will be the same for all bridges.
  2. Competition loading will stop at 50. kg, loading will continue until bridge failure (see 4.5).
  3. The load will be applied by means of a 40. mm square plate (see Figure 2) with a thickness (t) of at least 6. mm but less than 13. mm. A 9.53 mm (3/8 inch) diameter linkage is attached from above and below to the center of the plate. The plate will be horizontal and will be mounted with its edges parallel to the longitudinal axis of the bridge. Force will be applied to the loading plate by means of an apparatus shown schematically in Figure 3. The minimum initial load will be approximately 2. kg.
  4. The load will be applied with the center of the plate at one of three (3) possible locations on the longitudinal axis of the bridge: The center, 40. mm to the right of center, and 40. mm to the left of center of the bridge span (see Figure 1). The three (3) loading locations must lie in the same horizontal plane (P). This loading plane must lie a distance (P) between 20. mm and 40. mm above the support surface.
4. Testing
  1. On the day of the contest, contestants will center their bridge on the support surfaces. The judges will apply the loading plate and linkages to the selected loading position with two edges of the plate parallel to the longitudinal axis of the bridge and make attachments to the apparatus. 
  2. The loading plate will be lowered from above on the bridge at the selected loading location with two edges of the plate parallel to the longitudinal axis of the bridge. (The bridge must accommodate this method.)
  3. The load will be applied through the loading rod (from below), as described in section 3 above. Competition loading will stop at 50. kg. However, loading will continue until bridge failure (see 4.5).
  4. Bridge failure is defined as the inability of the bridge to carry additional load, or a load deflection of approximately 25.4 mm under the loading location, whichever occurs first. If a bridge has leg(s) which fail, the bridge will have failed regardless of deflection.
  5. The bridge with the highest structural efficiency, E, will be declared the winner. Bridges failing above 50. kg will be considered to have held 50. kg for efficiency calculation.
E = Load supported in grams (50,000g maximum) / Mass of bridge in grams
Picture
5. Qualification
  1. All construction and material requirements will be checked prior to testing and may be checked after testing. Bridges failing to meet these requirements will be disqualified. If physically possible, disqualified bridges may be tested as exhibition bridges at the discretion of the challenge director.
  2. If, during testing, a condition becomes apparent (i.e., use of ineligible materials, inability to support the loading plate, bridge optimized for a single loading point, etc.) which is a violation of the rules or prevents testing as described above in Section 4, that bridge shall be disqualified. If the disqualified bridge can accommodate loading, it may still be tested as an exhibition bridge as stated above. 
Picture
Decisions of the judges are final; the above rules will not change for the Northeast Pennsylvania Regional Bridge Building Competition even if the International Rules are changed after our printing of this criteria unless posted here. If any changes occur after original posting ALL registered participants will be notified. The loading apparatus may vary from the configuration shown.

Published: 10-Jan-2021   Updated Section 3 to match pdf specifications: 29-Jan-2021 
2021 NEPA Regional Bridge Building Competition Criteria

Location

​Location
North Pocono High School
97 Bochicchio Blvd
Moscow, PA 18444

http://www.npsd.org

    Contact Us

Submit

Connect With Us


Home
2024 Competition
Forms
Business Sponsorship
Public Support
FAQ
​Past Events
​About The Organization
  • Home
  • Forms
  • Sponsorship
  • FAQ
    • Coverage Area
    • Construction & Design Suggestions
    • Running Your Own School Bridge Competition
    • Terms of Service and Privacy Policy
  • 2025 Competition
  • About
  • Prior Year Events
    • Past Winners
    • 2024 Competition
    • 2023 Competition
    • 2022 International >
      • 2022 Results - International
      • 2022 Photos - International
    • 2022 Competition >
      • 2022 Results
      • 2022 Competition Criteria
      • 2022 Photos
    • 2021 Competition >
      • 2021 Competition Criteria
    • 2020 Competition >
      • 2020 Results
      • 2020 Photos
    • 2019 Competition >
      • 2019 Results
    • 2018 Competition >
      • 2018 Results
      • 2018 Photos
    • 2017 Competition >
      • 2017 Results
    • 2016 Competition >
      • 2016 NEPA Reg. Bridge Building Results
      • 2016 NEPA Reg. Bridge Building Criteria
    • 2015 Competition >
      • 2015 Northeast Pennsylvania Regional Bridge Building Results
      • 2015 Competition Photos
      • 2015 Northeast Pennsylvania Regional Bridge Building Sponsors
    • 2014 Competition >
      • 2014 Northeast Pennsylvania Regional Bridge Building Competition
      • 2014 Sponsors of the Northeast Pennsylvania Regional Bridge Building Competition
      • 2014 Criteria
    • 2013 Competition >
      • 2013 Scranton Times Newspaper Article
      • 2013 NEPA Competition Photos
    • 2012 Competition >
      • 2012 Competition Results
      • 2012 Photos
      • 2012 Sponsors
    • 2011 Competition >
      • 2011 International Competition Results
      • 2011 NEPA Regional Results
      • 2011 Photos
      • 2011 Sponsors
    • 2010 Competition >
      • 2010 Competition Results
      • 2010 Photos
      • 2010 Sponsors
    • 2009 Competition >
      • 2009 Competition Results
      • 2009 Photos
      • 2009 Sponsors
    • 2008 Competition >
      • 2008 Competition Results
      • 2008 Photos
      • 2008 Sponsors
    • 2007 Competition >
      • 2007 Competition Results
      • 2007 Photos
      • 2007 Sponsors
    • 2006 Competition >
      • 2006 Competition Results
      • 2006 Photos
      • 2006 Sponsors
    • 2005 Competition >
      • 2005 Competition Results
      • 2005 Photos
      • 2005 Sponsors
    • 2004 Competition >
      • 2004 Competition Results
      • 2004 Photos
      • 2004 Sponsors
    • 2003 Competition >
      • 2003 Competition Results
      • 2003 Photos
      • 2003 Sponsors
    • 1998 - 2002 Competitions >
      • 2002 Sponsors
      • 2001 Sponsors
      • 1998 through 2002 Competition Results
      • 1998 - 2000 Sponsors